2017
DOI: 10.1002/geot.201700041
|View full text |Cite
|
Sign up to set email alerts
|

DB major project Stuttgart‐Ulm, Albaufstieg‐Steinbühl Tunnel – Tunnel excavation and lining in karst

Abstract: The central problem with tunnelling in karstified rock mass is the karst structures, which can be empty, partially or completely filled. The filling can consist of soil, water or a combination of both. Before the start of tunnelling in the Steinbühl Tunnel, a section of the new DB line between Stuttgart and Ulm, the various structures had to be expected at any time. The associated risks could be reduced through good work preparation, high qualitative investigation measures and good miners and engineers. The ge… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The execution of the geophysical investigation of phase 2 is summarized in chapter 3.1.3. A more detailed documen tation of the measures, the attained results and conse quences for the further planning and construction pro cess are presented in [2,3].…”
Section: Steinbühl Tunnelmentioning
confidence: 99%
“…The execution of the geophysical investigation of phase 2 is summarized in chapter 3.1.3. A more detailed documen tation of the measures, the attained results and conse quences for the further planning and construction pro cess are presented in [2,3].…”
Section: Steinbühl Tunnelmentioning
confidence: 99%