2019
DOI: 10.1016/j.renene.2018.07.049
|View full text |Cite
|
Sign up to set email alerts
|

Decentralized solar rooftop photovoltaic in India: On the path of sustainable energy security

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
34
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 113 publications
(37 citation statements)
references
References 19 publications
0
34
0
Order By: Relevance
“…DISCOM can generate less power whenever an independent power producer generates a higher amount of power than the OAC's demand, in order to use surplus PV power and generate when PV generation is reduced and shortfalls arise [159,160]. The presence of multiple electricity regulatory boards like MNRE (Ministry of New and Renewable Energy), CERC (Central Electricity Regulatory Commission), SERC (Ministry of Power and State Electricity Regulatory Commission) also make the legal process a cumbersome task [161].…”
Section: Potential Of Bipv/bapv In Indiamentioning
confidence: 99%
“…DISCOM can generate less power whenever an independent power producer generates a higher amount of power than the OAC's demand, in order to use surplus PV power and generate when PV generation is reduced and shortfalls arise [159,160]. The presence of multiple electricity regulatory boards like MNRE (Ministry of New and Renewable Energy), CERC (Central Electricity Regulatory Commission), SERC (Ministry of Power and State Electricity Regulatory Commission) also make the legal process a cumbersome task [161].…”
Section: Potential Of Bipv/bapv In Indiamentioning
confidence: 99%
“…India is targeting 40 GW of grid-connected solar rooftop by 2022 (Central Electricity Authority, 2018). Despite rapid growth in rooftop installations, the country is not on track to meet this target (Bloomberg NEF, 2017;Trivedi et al, 2018;Rathore et al, 2019). Challenges include delays in disbursements of rooftop solar subsidies (Prateek, 2018).…”
Section: Figure 6: India's Reverse Auction Price History: Minimum Primentioning
confidence: 99%
“…In both countries, resistance from utilities has contributed to difficulties in obtaining net meters for rooftop solar, including delays of up to several months (Trivedi et al, 2018;Rathore et al, 2019). Utility-scale solar and wind projects have also been delayed or had their power curtailed due to transmission issues (World Bank, 2013; Viswamohanan and Aggarwal, 2018).…”
Section: Resistance From Utilitiesmentioning
confidence: 99%
See 1 more Smart Citation
“…In fact, avoided energy costs are typically more profitable than the produced electricity, itself. The development of decentralized systems is dependent on the local production of energy ( Kalkbrenner, 2019 ; Khan, 2020 ; Rathore et al, 2019 ). To this end, it is necessary to improve consumer habits, as this is a pre-condition for optimizing the size of battery energy storage (BES) system ( Cucchiella et al, 2016 ).…”
Section: Introductionmentioning
confidence: 99%