All Days 1999
DOI: 10.4043/10722-ms
|View full text |Cite
|
Sign up to set email alerts
|

Deepwater Installation of a Large Capacity FPSO with Large Number of Risers in the Marlim Field

Abstract: This paper describes the site installation of a turret moored Floating Production, Storage and Offloading System -FPSOin 780 meters of water in Campos Basin, offshore Brazil. The FPSO, a 270,000 dwt converted tanker, is the first of a series of two ordered by Petrobras for development of the Marlim Field. An internal bow mounted Turret system, anchored to the seafloor by 8 chain-wire rope-chain combined mooring legs, is used to permanently moor the FPSO in the location while allowing the vessel to freely weath… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance