2020
DOI: 10.1007/s10696-020-09396-2
|View full text |Cite
|
Sign up to set email alerts
|

Defining accurate delivery dates in make to order job-shops managed by workload control

Abstract: Workload control (WLC) is a lean oriented system that reduces queues and waiting times, by imposing a cap to the workload released to the shop floor. Unfortunately, WLC performance does not systematically outperform that of push operating systems, with undersaturated utilizations levels and optimized dispatching rules. To address this issue, many scientific works made use of complex job-release mechanisms and sophisticated dispatching rules, but this makes WLC too complicated for industrial applications. So, i… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
11
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 16 publications
(11 citation statements)
references
References 47 publications
0
11
0
Order By: Relevance
“…We also note that, if a single norm is used to constrain the cumulative workload of the system , the release phase is named ‘total shop load’ control. Conversely, if multiple norms are used to limit the cumulative workload of individual machines, the release phase is labelled as ‘bottleneck load’ or ‘load at each machine’, if control is limited to the supposed bottlenecks or extended to all machines, respectively (for more details, see 39 41 ).…”
Section: An Overview On Wlc Researchmentioning
confidence: 99%
See 1 more Smart Citation
“…We also note that, if a single norm is used to constrain the cumulative workload of the system , the release phase is named ‘total shop load’ control. Conversely, if multiple norms are used to limit the cumulative workload of individual machines, the release phase is labelled as ‘bottleneck load’ or ‘load at each machine’, if control is limited to the supposed bottlenecks or extended to all machines, respectively (for more details, see 39 41 ).…”
Section: An Overview On Wlc Researchmentioning
confidence: 99%
“…Like the ‘aggregated approach’, the load is rescaled as soon as job is released and, next, the value of will no longer be changed. The use of the corrected aggregate approach is generally preferable, as it assures high performance, and it also simplifies the fine-tuning of the norms, as described in greater details by 15 , 41 .…”
Section: An Overview On Wlc Researchmentioning
confidence: 99%
“…The fourth paper, by Mezzogori et al (2021), considers the workload control in lean production systems with the goal of reducing tardinesses and ensuring ontime deliveries. Existing research often handles this task by making use of sophisticated dispatching rules and complex job-release mechanisms, but it can make the workload control too complicated for real applications.…”
Section: The Papers In the Special Issuementioning
confidence: 99%
“…Two papers focus on supply chain problems, one on information sharing by Dominguez et al (2021) and one on leasing and selling strategies by Li et al (2021)). Two papers consider scheduling and dispatching problems in manufacturing, one in flexible manufacturing by Zanchettin (2021) and one on lean manufacturing by Mezzogori et al (2021). The fifth and last paper, by Guo et al (2021), considers a scheduling problem in the services industry, namely a medical staff scheduling problem.…”
mentioning
confidence: 99%
“…Workload Control is a production planning and control concept which was developed for high-variety make-to-order contexts, but can also be applied to make-to-stock contexts (Zaepfel and Missbauer 1993b;Stevenson et al 2005;Hutter et al 2018). A key production control function of Workload Control is order release, which reduces queues and waiting times by imposing a cap on the workload released to the shop floor (Mezzogori et al 2021). When order release control is applied, jobs do not enter the shop floor directly.…”
Section: Introductionmentioning
confidence: 99%