2015
DOI: 10.1109/jcn.2015.000050
|View full text |Cite
|
Sign up to set email alerts
|

Delay analysis of carrier sense multiple access with collision resolution

Abstract: To improve the efficiency of carrier sense multiple access (CSMA)-based medium access control (MAC) protocols, CSMA with collision resolution (CSMA/CR) has been proposed. In the CSMA/CR, a transmitting station can detect a collision by employing additional sensing after the start of a data transmission and then resolve the next collision that might occur by broadcasting a jam signal during a collision detection (CD) period. In this paper, we analyze the delay of a CSMA/CR based on a generic ppersistent CSMA mo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
8
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(8 citation statements)
references
References 20 publications
0
8
0
Order By: Relevance
“…Several research works have proposed MAC protocols for multi-priority sensor networks [2,22,23,25,31] and analyzed the effectiveness of CSMA -persistent scheme in terms of network delay and reliability [27][28][29]. In particular, Bhandari and Wang [2] proposed a priority-based deterministic channel access mechanism to reduce the access delay by assigning different MAC layer attributes and used an emergency indication slot to prioritize critical traffic over normal traffic.…”
Section: Related Workmentioning
confidence: 99%
See 3 more Smart Citations
“…Several research works have proposed MAC protocols for multi-priority sensor networks [2,22,23,25,31] and analyzed the effectiveness of CSMA -persistent scheme in terms of network delay and reliability [27][28][29]. In particular, Bhandari and Wang [2] proposed a priority-based deterministic channel access mechanism to reduce the access delay by assigning different MAC layer attributes and used an emergency indication slot to prioritize critical traffic over normal traffic.…”
Section: Related Workmentioning
confidence: 99%
“…In [27][28][29], -persistent CSMA models were used to analyze the network delay, but it did not consider different priority requirements.…”
Section: Related Workmentioning
confidence: 99%
See 2 more Smart Citations
“…If the channel is sensed idle, the user will send its signal, otherwise it will wait. This is called carrier sense multiple access (CSMA), which lead to a more efficient system compared to the ALOHA protocol, where no two users transmit at the same time [5], [6]. CSMA has many applications, particularly in public areas, such as university campuses, train stations, and airports where many users try to connect to one access point.…”
Section: Introductionmentioning
confidence: 99%