Delays for passenger trains on a regional railway line in southern Sweden

Abstract: The aim of this article is to study how selected variables influence delays in train traffic. Data has been collected on train movements, timetables, weather and capacity utilization on a highly utilized single-track railway line in southern Sweden during 2014. based on this dataset, we have analysed how different factors affect delays in passenger traffic. We measure delays in a novel way, as deviations from the scheduled duration for each line section and station stop, not as deviations from a published or o… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 16 publications
(12 citation statements)
references
References 15 publications
0
12
0
Order By: Relevance
“…The time-point segment analysis is based on a method previously developed for analysing delays in rail traffic (Palmqvist et al 2017), using a combination of t-tests, plots for different explanatory variables against average bus travel times, and multivariate regression models. First, Welch's t-test was used to gain an initial understanding, depicting statistical significance and effect size of the explanatory variables on bus travel time between time points.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…The time-point segment analysis is based on a method previously developed for analysing delays in rail traffic (Palmqvist et al 2017), using a combination of t-tests, plots for different explanatory variables against average bus travel times, and multivariate regression models. First, Welch's t-test was used to gain an initial understanding, depicting statistical significance and effect size of the explanatory variables on bus travel time between time points.…”
Section: Methodsmentioning
confidence: 99%
“…To be able to compare the impact of the bus stops with other factors, and to control the influence of these factors on the focal relationship, variables concerning day type, time of day, delay status, weather conditions, and passenger activity were included in the analyses. The selection of explanatory variables is based on previous studies on travel time variability (El-Geneidy et al 2011;Palmqvist et al 2017), combined with data availability considerations. Infrastructure variables were not included, due to the small number of time-point segments and, consequently, a too small variability of the infrastructure conditions.…”
Section: Methodsmentioning
confidence: 99%
“…Many researchers have demonstrated that punctuality is of paramount importance to rail user satisfaction [69][70][71]. Punctuality is considered to be one of the most relevant sustainability indicators in railway operations [72][73][74].…”
Section: Discussionmentioning
confidence: 99%
“…The over-arching advice on how to calculate recovery time is published by the International Union of Railways (UIC 2000). However, it is ultimately down to individual railway administrations and operators to calculate guidance on their own recovery margins (Palmqvist et al 2017) and hence these differ between and within countries, with different route densities, rolling stock and route lengths all exerting an influence. We might expect the significance of recovery time to vary across countries if only because what is deemed to be acceptable lateness, termed a delay threshold, itself varies across countries (Li et al 2010).…”
Section: Recovery Time In Railway Timetablesmentioning
confidence: 99%