2005
DOI: 10.1088/0029-5515/45/2/004
|View full text |Cite
|
Sign up to set email alerts
|

Demonstration tokamak fusion power plant for early realization of net electric power generation

Abstract: A demonstration tokamak fusion power plant Demo-CREST is proposed as the device for early realization of net electric power generation by fusion energy. The plasma configuration for Demo-CREST is optimized to satisfy the electric breakeven condition (the condition for net electric power, ) with the plasma performance of the ITER reference operation mode. This optimization method is considered to be suitable for the design of a demonstration power plant for early realization of net electric power generation, b… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
31
0

Year Published

2010
2010
2022
2022

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 47 publications
(31 citation statements)
references
References 25 publications
0
31
0
Order By: Relevance
“…However, the divertor is irradiated by highly energetic particles from fusion plasma. The heat load on the divertor for ITER is estimated to be 10 MW/m 2 at a steady state and 1000 MW/m 2 in plasma disruption and mitigated edge localized modes (ELMs) [1,2,3,4]. Up to now, the heat load on the divertor in previous MCF systems has been unreached parameter.…”
Section: Introductionmentioning
confidence: 99%
“…However, the divertor is irradiated by highly energetic particles from fusion plasma. The heat load on the divertor for ITER is estimated to be 10 MW/m 2 at a steady state and 1000 MW/m 2 in plasma disruption and mitigated edge localized modes (ELMs) [1,2,3,4]. Up to now, the heat load on the divertor in previous MCF systems has been unreached parameter.…”
Section: Introductionmentioning
confidence: 99%
“…Huge power handling in the SOL/divertor region is one of the crucial issues for a tokamak fusion DEMO reactor, such as SSTR [1], Demo-CREST [2], ARIES-AT [3], PPCS [4,5], SlimCS [6,7] and so on. In the DEMO reactor for the fusion power of 3 GW, exhausted thermal power from the core plasma to the SOL/divertor (P ext ) is expected to be larger than 500 MW, which is 5 -6 times larger than that in ITER.…”
Section: Introductionmentioning
confidence: 99%
“…1) [5], has two missions and correspondingly two plant operation phase: the demonstration phase and the development one. The first mission for the demonstration phase is to demonstrate the net electric power generation in a plant scale as soon as possible.…”
Section: Introductionmentioning
confidence: 99%
“…To make matters worse, the SOL density becomes small in comparison with ITER. As for the operation point of 1.0 GW fusion power for Demo-CREST, the divertor condition of (1.3 × 10 19 m −3 , 260 MW) about the SOL density and the required impurity radiation for the heat load less than 10 MW/m 2 is more severe than that of ITER (3.3 × 10 19 m −3 , 47 MW) [5]. At least, we have to keep a high SOL density in comparison with the ITER condition.…”
Section: Introductionmentioning
confidence: 99%