“…Case: Thailand Underground Rail project(Ghosh and Jintanapakanont, 2004). Inaccurate project cost estimate Audit Scotland(2011),HS2 Ltd (2009), Nielsen andRandall (2013) Failure to meet specified standardsArain et al (2004), Audit Scotland(2011),Nielsen and Randall (2013) Technical difficulties in utilities diversionsHS2 Ltd. (2009), Audit Scotland (2011), Nielsen and Randall (2013 Engineering and design changeAustin et al (2000),Choo et al (2004). Case: Thailand Underground Rail project(Ghosh and Jintanapakanont, 2004).Supply chain breakdownHaynes(2002), Eglin (2003), Norrman and Jansson (2004), Kane (2001), Wolstenhome (2009) Project time overruns Yang and Wei (2010), (Fugar and Agyakwah-Baah, (2010), Megha and Rajiv, (2013)), Nielsen and Randall (2013) Ramanathan et al, (2012) Project cost overruns Yang and Wei (2010).…”