2004
DOI: 10.1016/j.autcon.2003.09.012
|View full text |Cite
|
Sign up to set email alerts
|

DePlan: a tool for integrated design management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
17
0

Year Published

2004
2004
2020
2020

Publication Types

Select...
5
2
2

Relationship

0
9

Authors

Journals

citations
Cited by 47 publications
(17 citation statements)
references
References 8 publications
0
17
0
Order By: Relevance
“…Case: Thailand Underground Rail project(Ghosh and Jintanapakanont, 2004). Inaccurate project cost estimate Audit Scotland(2011),HS2 Ltd (2009), Nielsen andRandall (2013) Failure to meet specified standardsArain et al (2004), Audit Scotland(2011),Nielsen and Randall (2013) Technical difficulties in utilities diversionsHS2 Ltd. (2009), Audit Scotland (2011), Nielsen and Randall (2013 Engineering and design changeAustin et al (2000),Choo et al (2004). Case: Thailand Underground Rail project(Ghosh and Jintanapakanont, 2004).Supply chain breakdownHaynes(2002), Eglin (2003), Norrman and Jansson (2004), Kane (2001), Wolstenhome (2009) Project time overruns Yang and Wei (2010), (Fugar and Agyakwah-Baah, (2010), Megha and Rajiv, (2013)), Nielsen and Randall (2013) Ramanathan et al, (2012) Project cost overruns Yang and Wei (2010).…”
mentioning
confidence: 99%
“…Case: Thailand Underground Rail project(Ghosh and Jintanapakanont, 2004). Inaccurate project cost estimate Audit Scotland(2011),HS2 Ltd (2009), Nielsen andRandall (2013) Failure to meet specified standardsArain et al (2004), Audit Scotland(2011),Nielsen and Randall (2013) Technical difficulties in utilities diversionsHS2 Ltd. (2009), Audit Scotland (2011), Nielsen and Randall (2013 Engineering and design changeAustin et al (2000),Choo et al (2004). Case: Thailand Underground Rail project(Ghosh and Jintanapakanont, 2004).Supply chain breakdownHaynes(2002), Eglin (2003), Norrman and Jansson (2004), Kane (2001), Wolstenhome (2009) Project time overruns Yang and Wei (2010), (Fugar and Agyakwah-Baah, (2010), Megha and Rajiv, (2013)), Nielsen and Randall (2013) Ramanathan et al, (2012) Project cost overruns Yang and Wei (2010).…”
mentioning
confidence: 99%
“…The third stage from 1990s to 2010s takes the integration, distribution and collaboration of different design tools as main feature [48][49][50][51][52][53][54][55][56][57][58][59][60]. On one hand, a lot of design programs greatly expand their functions based on improvement of existing functions, on other hand, design data produced by these programs can be well organized by PLM, PDM or other platforms.…”
Section: B From the Development Of Computer-aided Designmentioning
confidence: 99%
“…Internet-based framework called the process-parameter-interface model was developed to address the design management issues associated with improving design process scheduling and increasing the efficiency of collaboration [6].…”
Section: Past Rearchmentioning
confidence: 99%