Derivation and Hardware-in-the-loop Testing for a Road Tunnel Controller

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 3 publications
0
3
0
Order By: Relevance
“…In previous work the Swalmen tunnel was modeled using 180 automata and 414 requirements, from which a supervisor is synthesized with approximately 10 71 states. The complete model can be found in [40].…”
Section: Case Study: the Swalmen Tunnelmentioning
confidence: 99%
See 1 more Smart Citation
“…In previous work the Swalmen tunnel was modeled using 180 automata and 414 requirements, from which a supervisor is synthesized with approximately 10 71 states. The complete model can be found in [40].…”
Section: Case Study: the Swalmen Tunnelmentioning
confidence: 99%
“…The HIL setup is shown in Figure 24. The implemented PLC code is automatically generated from the local supervisors, and can be found in [40]. Subsequently, communication is set up between the PLCs using the ABB control builder software.…”
Section: Hil Testingmentioning
confidence: 99%
“…In previous work the Swalmen tunnel was modeled using 180 automata 414 requirements, from which a supervisor is synthesized with approximately 10 71 states. The complete model can be found in [40].…”
Section: Case Study: the Swalmen Tunnelmentioning
confidence: 99%