Design and Construction of a Highway Double-Deck Suspension Bridge

Abstract: The nearly finished Xinghai Bay Bridge at the southern seaside of Dalian in China is a long-span, double-deck, cross-sea suspension bridge. This bridge is the largest span highway double-deck suspension bridge with anchorage at sea in China. In view of the particular problems posed by the surrounding conditions, functional requirements, and aesthetic considerations, this project required a special structural design and innovations in construction technology. These innovations—including the steel truss design a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…As regards to principle of designing acceleration lane length, considering the high occupancy of large trucks in China, commonly it was separated to acceleration segment, waiting segment, taper and calculated respectively [11][12][13][14][15][16] ,namely vehicles accelerated to the merging speed, and then waited under this speed until the acceptable gap appeared , then finished the merging. Among that, the calculation of waiting segment was mainly using gap acceptance theory, the method was mature and lots of achievements have been obtained, which offset the deficiency of Chinese standard on designing acceleration lane length.…”
Section: Introductionmentioning
confidence: 99%
“…As regards to principle of designing acceleration lane length, considering the high occupancy of large trucks in China, commonly it was separated to acceleration segment, waiting segment, taper and calculated respectively [11][12][13][14][15][16] ,namely vehicles accelerated to the merging speed, and then waited under this speed until the acceptable gap appeared , then finished the merging. Among that, the calculation of waiting segment was mainly using gap acceptance theory, the method was mature and lots of achievements have been obtained, which offset the deficiency of Chinese standard on designing acceleration lane length.…”
Section: Introductionmentioning
confidence: 99%