2000
DOI: 10.1016/s0951-8339(00)00016-2
|View full text |Cite
|
Sign up to set email alerts
|

Design and construction of a floating swing bridge in Osaka

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
9
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
5
2
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 18 publications
(9 citation statements)
references
References 1 publication
0
9
0
Order By: Relevance
“…In designing this floating bridge, however, these standards alone were not sufficient. The major technical challenges are listed below (Maruyama et al 1998a-d;Watanabe et al 1998Watanabe et al , 1999Watanabe et al , 2001aWatanabe et al , b, 2002Watanabe et al , 2003aWatanabe andUtsunomiya 2001, 2003;Watanabe 2003Watanabe , 2004: (1) Since a floating bridge is far more vulnerable to meteorological and oceanographic conditions than a conventional fixed bridge, proper environmental conditions that are suitable to the characteristics of the installation site must be met in designing the bridge. Floating structures have been one of the main focuses of investigation in various occasions, e.g., at the time of planning the Kansai International Airport, and in the ''Mega-Float Project'' led by the Ministry of Transport.…”
Section: Technical Challengesmentioning
confidence: 99%
“…In designing this floating bridge, however, these standards alone were not sufficient. The major technical challenges are listed below (Maruyama et al 1998a-d;Watanabe et al 1998Watanabe et al , 1999Watanabe et al , 2001aWatanabe et al , b, 2002Watanabe et al , 2003aWatanabe andUtsunomiya 2001, 2003;Watanabe 2003Watanabe , 2004: (1) Since a floating bridge is far more vulnerable to meteorological and oceanographic conditions than a conventional fixed bridge, proper environmental conditions that are suitable to the characteristics of the installation site must be met in designing the bridge. Floating structures have been one of the main focuses of investigation in various occasions, e.g., at the time of planning the Kansai International Airport, and in the ''Mega-Float Project'' led by the Ministry of Transport.…”
Section: Technical Challengesmentioning
confidence: 99%
“…It follows from the above that the available experience regarding the performance of similar structures is very scarce. Some case studies concerning the response prediction of existing floating bridges are available, e.g., for the Nordhordland Bridge [1], the Bergsøysund Bridge [2][3][4][5], the Hood Canal Bridge [6], the William R. Bennett Floating Bridge [7], and the Yumemai Bridge [8,9]. Recently, studies regarding response prediction of planned or generic floating bridges have also emerged in literature, e.g., [10][11][12].…”
Section: Introductionmentioning
confidence: 99%
“…According to the different directions of rotation, it can be divided into three types: vertical rotating construction, horizontal rotating construction and a combination of the above two constructions [1][2][3] and this study focuses on horizontal rotating construction. The horizontal rotating construction, which also can be seen as the accelerated bridge construction (ABC) method, provides the optimal urban bridge construction solution by reducing the impact on traffic, improving safety, shortening the project duration, and optimizing the project budget 4,5 .…”
Section: Introductionmentioning
confidence: 99%