2009
DOI: 10.1007/s11066-008-9024-z
|View full text |Cite
|
Sign up to set email alerts
|

Design and evaluation of road pricing: state-of-the-art and methodological advances

Abstract: Transport networks, Congestion pricing, Road pricing, Network pricing, Network design, Private toll road competition, Capacity investments, Evaluation of pricing schemes,

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
71
0
2

Year Published

2012
2012
2019
2019

Publication Types

Select...
9
1

Relationship

1
9

Authors

Journals

citations
Cited by 140 publications
(73 citation statements)
references
References 375 publications
(396 reference statements)
0
71
0
2
Order By: Relevance
“…ITS can be deployed to enable electronic payment for access to certain routes, zones or facilities, principle whilst associated technologies of access control (such as rising bollards), can provide the intelligent infrastructure required for charging schemes to go ahead [31]. Enforcement measures can also support the shift to less carbon intensive behaviourAutomatic Number Plate Recognition (ANPR) can provide the capacity for monitoring and surveillance to incur penalties and therefore mitigate excessive and aggressive driving such as speeding [29].…”
Section: Overview Of Its Systems In the Low Carbon Contextmentioning
confidence: 99%
“…ITS can be deployed to enable electronic payment for access to certain routes, zones or facilities, principle whilst associated technologies of access control (such as rising bollards), can provide the intelligent infrastructure required for charging schemes to go ahead [31]. Enforcement measures can also support the shift to less carbon intensive behaviourAutomatic Number Plate Recognition (ANPR) can provide the capacity for monitoring and surveillance to incur penalties and therefore mitigate excessive and aggressive driving such as speeding [29].…”
Section: Overview Of Its Systems In the Low Carbon Contextmentioning
confidence: 99%
“…Several factors Z i may co-exist and influence the opinions of agent i towards the one or the other direction. On the one hand, an agent i can positively assess congestion pricing because of the expected travel time savings when moving or searching street parking in the city, favorable environmental attitude, anticipated gains due to changes in land values, positive own-experience from the pilot application in the trial period, and positive information or observation from other congestion pricing implementations worldwide [21]. On the other hand, the same agent can negatively assess congestion pricing because of the opposite position of the political party that he/she supports, equity issues, fear of markets, memory lapses, error of perception, stress of information gathering and pressure from social norms [20,22,23].…”
Section: The Multi-equilibria Regulation Modelmentioning
confidence: 99%
“…Chu 1995;Doan et al 2011;Tsekeris, Voß 2009;Yang, Huang 1997Zhang, Ge 2004) and utilising financial derivatives to facilitate the implementation of congestion charging (Nie 2012;Teodorović et al 2008;Tian et al 2013;Yang, Wang 2011;Yao et al 2010;Xiao et al 2013). Differing from the work on designing or optimising traffic congestion pricing schemes, one contribution of the current work is that we aim to analyse and overcome derived problems of the existing congestion pricing schemes operating across the world by means of analytical techniques, specifically, focusing on the undesired boundary effect problem arising from the implementation and operations of congestion charging.…”
Section: Introductionmentioning
confidence: 99%