2022
DOI: 10.1016/j.cles.2022.100003
|View full text |Cite
|
Sign up to set email alerts
|

Design and performance assessment of a solar-to-hydrogen system thermally assisted by recovered heat from a molten carbonate fuel cell

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 51 publications
0
3
0
Order By: Relevance
“…For instance, Mehr et al [ 24 ] structured the unit price of MCFC into three stages, as to long‐, near‐, and current‐term situations, corresponding to 2000, 4000, and 6000 € kW −1 . Coulibaly et al [ 25 ] considered the cost of MCFC as 3000 $ kW −1 to perform the economic analysis of their proposed energy system. This uncertainty in the cost of MCFC can be attributed to their production volume; as such, a rise in the production volume could drop the per unit price of MCFC.…”
Section: Assumptionsmentioning
confidence: 99%
“…For instance, Mehr et al [ 24 ] structured the unit price of MCFC into three stages, as to long‐, near‐, and current‐term situations, corresponding to 2000, 4000, and 6000 € kW −1 . Coulibaly et al [ 25 ] considered the cost of MCFC as 3000 $ kW −1 to perform the economic analysis of their proposed energy system. This uncertainty in the cost of MCFC can be attributed to their production volume; as such, a rise in the production volume could drop the per unit price of MCFC.…”
Section: Assumptionsmentioning
confidence: 99%
“…Its optimization goal was to minimize the cost of energy (COE). Coulibaly et al [12] optimized the design of a solar-to-hydrogen system to minimize the levelized cost of electricity (LCOE). Pu et al [13] configured an integrated energy system with hydrogen storage to minimize the life cycle costs (LCC) using an improved random-trigonometric grey wolf optimizer (RT-GWO).…”
Section: Literature Review 21 Optimization Objects Objectives and Met...mentioning
confidence: 99%
“…where C inv, * is the unit investment cost of the device of type * ; and P * ,i is the installed capacity of the device of type * of the MG i. The capital recovery factor of the device of type * is CRF * , and it can be calculated according to the following formula [12,20]:…”
Section: Outer Multi-objective Optimization Modelmentioning
confidence: 99%