Design–build pre-qualification and tendering approach for public projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0
1

Year Published

2008
2008
2016
2016

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 40 publications
(19 citation statements)
references
References 10 publications
0
16
0
1
Order By: Relevance
“…In this case the Czech Republic is characteristic in that there is almost no usage of design-build in the public sector, even though the private sector is familiar with this scheme. The motivation is to show the advantages of design-build to public authorities (AL-RESHAID 2005).…”
Section: Risk Evaluation In Design-build Projectsmentioning
confidence: 99%
“…In this case the Czech Republic is characteristic in that there is almost no usage of design-build in the public sector, even though the private sector is familiar with this scheme. The motivation is to show the advantages of design-build to public authorities (AL-RESHAID 2005).…”
Section: Risk Evaluation In Design-build Projectsmentioning
confidence: 99%
“…A series of decision models based on various approaches were developed for contractor selection, such as the integrated multi-objective decision making process (Keeney and Raiffa 1976;Kashiwagi and Byfield 2002;Demirtas and Üstün 2008), the neural networks (Khosrowshahi 2001;Lam et al 2000), AHP (Al-Harbi 2001;Al-Reshaid and Kartam 2005;Mahdi et al 2002;Topcu 2004), DEA (Tran 2002;McCabe et al 2005) the multi-attribute analysis model (Lai et al 2004), analytic network process (Cheng and Li 2004;Ravi et al 2005;Bayazit 2006), integer programming (Missbauer and Hauber 2005), unit-price based (Wang et al 2006), multi-attribute utility theory (Lambropoulos 2007), fuzzy-excellent order method (Wang and Triantaphyllou 2008), fuzzy-AHP-Smart (Padhi and Mohapatra 2009), and the binary goal programming model (Padhi et al 2010). Although these methods were designed to single decision maker, they have drawn great attention to the area of contractor selection in construction projects and provided basis and new ideas to group decision-making.…”
Section: Group Decision-making Approaches For Contractor Selectionmentioning
confidence: 99%
“…One focuses on contractor prequalification or contractor selection from the owner's perspective [20][21][22][23]. The other emphasises on analysing factors determining the degree of subcontracting [24] or supporting management in subcontracting rating from the contractor's perspective [25].…”
Section: Literature Reviewmentioning
confidence: 99%