Design, Control and Automation of MHPP - An Experimental Setup

Abstract: In this paper the design, manufacturing and automation of a micro hydroelectric power plant (MHPP) prototype has been carried out. The experimental setup consists of three 1 kW synchronous generators (SGs) working in synchronization with each other and with the grid, three Pelton turbines with a single nozzle manufactured using a 3D printer, a water tank with a capacity of approximately one ton, a 5.5 kW centrifugal pump providing appropriate flow and head conditions and an 11 kW driver controlling the speed o… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 37 publications
0
0
0
Order By: Relevance