Deep Foundations on Bored and Auger Piles 2020
DOI: 10.1201/9781003078517-8
|View full text |Cite
|
Sign up to set email alerts
|

Design of axially loaded bored piles – European codes, practice and experience

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Because of the similarity between pile and cone, the CPT can be considered as a miniature pile where the CPT data such as cone tip resistance (q c ) corresponds to the pile end bearing and the cone sleeve friction (f s ) corresponds to pile shaft resistance. Therefore, throughout the years, many empirical and semi-empirical relationships have been established between the CPT data and pile capacity to develop many direct pile-CPT methods (e.g., Bustamante and Gianeselli [1], Bloomquist et al [2], Hu et al [3], Abu-Farsakh and Titi [4], and De Cock and Legrand [5]). Designing piles using these methods offers advantages over other methods since they can give a quick initial estimation of capacity before pile installation at a far lower cost.…”
mentioning
confidence: 99%
“…Because of the similarity between pile and cone, the CPT can be considered as a miniature pile where the CPT data such as cone tip resistance (q c ) corresponds to the pile end bearing and the cone sleeve friction (f s ) corresponds to pile shaft resistance. Therefore, throughout the years, many empirical and semi-empirical relationships have been established between the CPT data and pile capacity to develop many direct pile-CPT methods (e.g., Bustamante and Gianeselli [1], Bloomquist et al [2], Hu et al [3], Abu-Farsakh and Titi [4], and De Cock and Legrand [5]). Designing piles using these methods offers advantages over other methods since they can give a quick initial estimation of capacity before pile installation at a far lower cost.…”
mentioning
confidence: 99%