2020
DOI: 10.1088/1755-1315/519/1/012047
|View full text |Cite
|
Sign up to set email alerts
|

Design of Coal Handling System for Filling Bungker using PID Method in Coal PLTU

Abstract: The process of filling bunkers at PT PJB UBJ O&M PLTU 1 east java Pacitan is very dependent on coal handling system. In the existing system is still dependent on human resources as an operator, of course, very influential on human performance. The level of the bunker is a major problem for the continuity of the combustion process in the boiler. To support productivity, the authors make an innovative coal handling system design and monitor the level conditions in the bunker by using the PID (Proportional In… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…The automation system in the coal industry is important [5] [11], one of them is crushing and BLC systems. In general, the control and supervision system on the Crushing and BLC system was carried out separately by two operators on each system.…”
Section: Introductionmentioning
confidence: 99%
“…The automation system in the coal industry is important [5] [11], one of them is crushing and BLC systems. In general, the control and supervision system on the Crushing and BLC system was carried out separately by two operators on each system.…”
Section: Introductionmentioning
confidence: 99%