1977
DOI: 10.1049/piee.1977.0007
|View full text |Cite
|
Sign up to set email alerts
|

Design of low-voltage distribution networks: a mathematical programming method

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
19
0
2

Year Published

1979
1979
2019
2019

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 55 publications
(22 citation statements)
references
References 0 publications
1
19
0
2
Order By: Relevance
“…This methodology tries to solve together the analysis of location of substations, dimensioning of substations and feeders and finally distribution networks routing [Aoki et al 1990, Blanchard et al 1996, Boardman, Meckiff 1985, Brauner, Zobel 1994, El-Kadi 1984, Fawzi et al 1983, Gönen, Foote 1981, Gönen, Foote 1982, Gönen 1986, Hindi, Brameller 1977, Hsu, Chen 1990, Lin et al 1998, Miranda et al 1994, Nara et al 1991, Nara et al 1992, Ponnavaikko, Prakasa 1981, Quintana et al 1993, Ramírez-Rosado, BernalAgustin 1998, Ramírez-Rosado et al 1999, Ramírez-Rosado., Gönen 1991, Sun et al 1982, Tang 1996, Thompson, Wall 1981.…”
Section: Handling Of the Distribution Systemmentioning
confidence: 99%
See 4 more Smart Citations
“…This methodology tries to solve together the analysis of location of substations, dimensioning of substations and feeders and finally distribution networks routing [Aoki et al 1990, Blanchard et al 1996, Boardman, Meckiff 1985, Brauner, Zobel 1994, El-Kadi 1984, Fawzi et al 1983, Gönen, Foote 1981, Gönen, Foote 1982, Gönen 1986, Hindi, Brameller 1977, Hsu, Chen 1990, Lin et al 1998, Miranda et al 1994, Nara et al 1991, Nara et al 1992, Ponnavaikko, Prakasa 1981, Quintana et al 1993, Ramírez-Rosado, BernalAgustin 1998, Ramírez-Rosado et al 1999, Ramírez-Rosado., Gönen 1991, Sun et al 1982, Tang 1996, Thompson, Wall 1981.…”
Section: Handling Of the Distribution Systemmentioning
confidence: 99%
“…There is no analysis of the demand growth, and there is no need to study the possible changes in substation and feeders installations through the planning period. Usually the horizon considered is one year [Adams, Laughton, 1974, Aoki et al 1990, Crawford, Holt Jr 1975, ElKadi 1984, Fawzi et al 1983, Gönen, Foote 1981, Hindi, Brameller 1977, Holt Jr, Crawford 1976, Masud 1974, Sun et al 1982, Thompson, Wall 1981, Wall et al 1979]. …”
Section: Planning Horizonmentioning
confidence: 99%
See 3 more Smart Citations