2015
DOI: 10.1016/j.promfg.2015.07.027
|View full text |Cite
|
Sign up to set email alerts
|

Designing a Future Value Stream Mapping to Reduce Lead Time Using SMED-A Case Study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
16
0
18

Year Published

2017
2017
2022
2022

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 57 publications
(35 citation statements)
references
References 2 publications
1
16
0
18
Order By: Relevance
“…This statistical finding is similar to reports from Rodríguez-Méndez et al [21]. (5) Once SMED has been implemented, maquiladora companies need to monitor the setup/changeover once more, including timing and video recording, to identify the current status of the setup/changeover and detect potential improvement areas, thereby continuing with the continuous improvement cycle, as mentioned in Azizi and Manoharan [26]. (6) New machines must replace old ones as soon as their lifecycle ends.…”
Section: Conclusion and Industrial Implicationssupporting
confidence: 82%
See 2 more Smart Citations
“…This statistical finding is similar to reports from Rodríguez-Méndez et al [21]. (5) Once SMED has been implemented, maquiladora companies need to monitor the setup/changeover once more, including timing and video recording, to identify the current status of the setup/changeover and detect potential improvement areas, thereby continuing with the continuous improvement cycle, as mentioned in Azizi and Manoharan [26]. (6) New machines must replace old ones as soon as their lifecycle ends.…”
Section: Conclusion and Industrial Implicationssupporting
confidence: 82%
“…In addition, since such operators know best the production process, including changeovers, setups, risks, and opportunity areas, companies should constantly interview them to make sure the adopted measurement methods are appropriate. Also, new improvement proposals must be tape recorded to visualize performed changes [26]. This discussion allows us to assume that there is a significant relationship between setup work analyzed before and after the improvement process.…”
Section: Hypotheses Developmentmentioning
confidence: 99%
See 1 more Smart Citation
“…Asimismo, Edtmayr, Sunk, & Sihn (2016) combinan algunos parámetros de sostenibilidad con el mapeo de cadena de valor, con el propósito de identificar y reducir los recursos de consumo utilizados en los buffers, transporte y procesos a través de las actividades de la cadena de valor. Azizi & Manoharan (2015) diseñan un Value Stream Mapping para mejorar la productividad en unas pequeñas y medianas empresas a través de la eliminación de actividades que no agregan valor al producto. Los autores utilizan un caso aplicado a una empresa productora de equipos electrónicos, la cual tenía altos tiempos y costos de producción.…”
Section: Brown Amundson and Badurdeen (2014) Elaboran Un Valueunclassified
“…It can be seen that lean manufacturing has been developed, growth up, and adopted progressively in many major manufacturing industries in order to remain their competitive in an increasingly global market [2]. The main focus of this approach is on cost reduction by eliminating waste or non-value added activities.…”
Section: Introductionmentioning
confidence: 99%