Designing and Sensitivity Analysis of an Off-Grid Hybrid Wind-Solar Power Plant with Diesel Generator and Battery Backup for the Rural Area in Iran

Abstract: Because of the lack of transmission and distribution grid of electricity in remote and inaccessible areas due to the high cost of construction of the transmission line along with the unsuitable geographical conditions and taking into account the factors affecting sustainable energy production, renewable energy seems like a sensible solution. Therefore, in this paper, considering the solar and wind potential of Turkalan village located in East Azerbaijan Province, the combined solar-wind-diesel generator system… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
10
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 37 publications
(18 citation statements)
references
References 34 publications
0
10
0
Order By: Relevance
“…P batt:cmax:kbm is related to the kinetic battery model, P batt:cmax:mcr is related to the battery's maximum charging rate, and P batt:cmax:mcc is related to its maximum charging current. The HOMER software then considers the minimum of these three values the maximum power [49]:…”
Section: Homer Softwarementioning
confidence: 99%
“…P batt:cmax:kbm is related to the kinetic battery model, P batt:cmax:mcr is related to the battery's maximum charging rate, and P batt:cmax:mcc is related to its maximum charging current. The HOMER software then considers the minimum of these three values the maximum power [49]:…”
Section: Homer Softwarementioning
confidence: 99%
“…In 2018, all urban population and 100% of all rural households with more than 20 households had access to electricity. This year, Iran's required electricity energy was supplied by power plants affiliated with the Ministry of Energy, large industries, and the private sector, including 25 steam power plants, 70 gas plants, 25 distributed generation units, 28 combined cycle power plants, 45 diesel power plants, 59 hydraulic power plants (large, medium, small, and mini), 270 wind turbines, 50 photovoltaic units, biogas power plants, and 2 thermal recycling power plants owned by the private sector 9 . Also, large industries have 5 steam power plants, and 16 gas plants.…”
Section: Introductionmentioning
confidence: 99%
“…Also, the study mentioned that the CC method minimized the financial indicators of the optimal solution more than other strategies. Some other relevant studies of the technoeconomic feasibility of HES have focused on three major groups, comparison procedures [27], design and planning [28][29][30], and energy management [31,32]. The project lifetime in all of these research articles has been set at 20 or 25 years, with no consideration of the impacts of reducing the project's lifetime.…”
Section: Introductionmentioning
confidence: 99%