SPE International Symposium and Exhibition on Formation Damage Control 2008
DOI: 10.2118/112292-ms
|View full text |Cite
|
Sign up to set email alerts
|

Designing Well Fluids for the Ormen Lange Gas Project, Right on the Edge

Abstract: The challenges in developing the Ormen Lange field were the harsh weather conditions, deep-water depth, subsea topography and sub-zero seabed temperatures. Due to environmental constraints and the selected sand face completion type, a water-based fluid system was required. This paper discusses the design of the fluids to give full hydrate inhibition, maximize breaker effectiveness, provide low overbalance, and reduce corrosion risk. An extensive research and development program was initiated that spanned over … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2015
2015
2015
2015

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 1 publication
0
0
0
Order By: Relevance