2022
DOI: 10.1155/2022/5798625
|View full text |Cite
|
Sign up to set email alerts
|

Destruction Feature Extraction of Prefabricated Residential Building Components Based on BIM

Abstract: In order to improve the damage feature extraction effect of prefabricated residential building components and improve the structural stability of prefabricated residential components, this paper applies BIM technology to the structural feature analysis of prefabricated residential components. Moreover, this paper adopts the simple superposition method and combines the first strength theory of material mechanics to derive the formula for calculating the cracking torque of prefabricated residential building comp… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 20 publications
0
3
0
Order By: Relevance
“…At present, information technology is extensively employed throughout the entirety of assembly-building projects, including design, production, construction, and administration. For example, the application of building information modeling (BIM) for component damage monitoring [11], the assessment of implied carbon emissions via the Internet of Things (IOT) [12], the implementation of radio frequency signal technology (RFID) to update real-time construction information [13], the utilization of 3D printing technology to print prefabricated components [14], and the optimization of simulations through virtual reality (VR) technology [15]. Additionally, the researchers integrated various information technologies.…”
Section: Assembly Building Project Informatizationmentioning
confidence: 99%
“…At present, information technology is extensively employed throughout the entirety of assembly-building projects, including design, production, construction, and administration. For example, the application of building information modeling (BIM) for component damage monitoring [11], the assessment of implied carbon emissions via the Internet of Things (IOT) [12], the implementation of radio frequency signal technology (RFID) to update real-time construction information [13], the utilization of 3D printing technology to print prefabricated components [14], and the optimization of simulations through virtual reality (VR) technology [15]. Additionally, the researchers integrated various information technologies.…”
Section: Assembly Building Project Informatizationmentioning
confidence: 99%
“…At the present stage, yard-type independent houses are quite common in new rural construction. The floors of such buildings are basically 1-3 floors, and the building area is 100-400 square meters [1] . Take 2-4 floors as an example, the total cost of yard-type rural buildings is about 200,000 to 800,000 RMB.…”
Section: Rural Buildings Have Small Volume and Thin Profitmentioning
confidence: 99%
“…A building assembled by prefabricated components on the construction site is called a prefabricated building [1][2][3][4][5][6]. On September 27, 2016, the State Council issued the Guidelines on Vigorously Developing Prefabricated Buildings by the General Office of the State Council, which clearly defined the key areas for vigorously developing prefabricated buildings and steel structures, the proportion of prefabricated buildings in new buildings in the future, and the key cities for developing them [7][8][9][10][11]. Due to the irregular outer contour of most of the prefabricated buildings, it is more difficult and demanding to calibrate their image layout, compared with other types of buildings [12][13][14][15].…”
Section: Introductionmentioning
confidence: 99%