Proceedings of International Conference on Particle Accelerators
DOI: 10.1109/pac.1993.308907
|View full text |Cite
|
Sign up to set email alerts
|

Detailed studies on the beam transfer line from linac to Low Energy Booster synchrotron for the SSC

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…Detailed design of the transport and transfer lines is also complete, and most of the major components have been ordered, or are being prototyped [27]. In addition, considerable progress has been made on the design of the LEB injection girder.…”
Section: Iicurrent Statusmentioning
confidence: 99%
“…Detailed design of the transport and transfer lines is also complete, and most of the major components have been ordered, or are being prototyped [27]. In addition, considerable progress has been made on the design of the LEB injection girder.…”
Section: Iicurrent Statusmentioning
confidence: 99%