2019
DOI: 10.1016/j.wear.2019.03.025
|View full text |Cite
|
Sign up to set email alerts
|

Detecting and monitoring erosion-corrosion using ring pair electrical resistance sensor in conjunction with electrochemical measurements

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

1
26
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
1
1

Relationship

1
5

Authors

Journals

citations
Cited by 37 publications
(27 citation statements)
references
References 42 publications
1
26
0
Order By: Relevance
“…The flow loop is composed of a water tank, a centrifugal pump which is normally used to allow the sand particle passing through, a pressure gauge, and a flow meter. According to the measured hydrodynamic parameters, the distributions of the flow velocity, wall shear stress, and sand concentration at a certain pipe section ( Figure 6) can be well predicted from the CFD simulation [76]. The CFD simulation results can facilitate understanding the non-uniform erosion-corrosion behavior.…”
Section: Test Flow Loopmentioning
confidence: 81%
See 4 more Smart Citations
“…The flow loop is composed of a water tank, a centrifugal pump which is normally used to allow the sand particle passing through, a pressure gauge, and a flow meter. According to the measured hydrodynamic parameters, the distributions of the flow velocity, wall shear stress, and sand concentration at a certain pipe section ( Figure 6) can be well predicted from the CFD simulation [76]. The CFD simulation results can facilitate understanding the non-uniform erosion-corrosion behavior.…”
Section: Test Flow Loopmentioning
confidence: 81%
“…However, the erosion-corrosion behaviors of complex pipe sections such as the elbow and pipe weldment, and the pipe sections having a diameter change cannot be simulated using rotating disc/cylinder and slurry jet rig. As a result, test flow loops which allow the installation of different kinds of sensors are always adopted to study the erosion-corrosion behaviors of some typical pipe sections [6,14,[71][72][73][74][75][76]. The test flow loop can provide a more realistic erosion-corrosion condition which directly corresponds to practice energy pipelines.…”
Section: Test Flow Loopmentioning
confidence: 99%
See 3 more Smart Citations