Determination of Deformation Mechanism and Countermeasures in Silty Clay Tunnel

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
28
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 54 publications
(28 citation statements)
references
References 31 publications
0
28
0
Order By: Relevance
“…At present, the main methods to improve the performance of geotextiles are additives, chemical modification, and composite geotextiles [114,115]. It is a shared method to use additives to make up the performance defects of geotextiles, such as stabilizers and antioxidants, but an army of additives are polluting the environment.…”
Section: High Performance Geotextilesmentioning
confidence: 99%
“…At present, the main methods to improve the performance of geotextiles are additives, chemical modification, and composite geotextiles [114,115]. It is a shared method to use additives to make up the performance defects of geotextiles, such as stabilizers and antioxidants, but an army of additives are polluting the environment.…”
Section: High Performance Geotextilesmentioning
confidence: 99%
“…erefore, in order to ensure the safety of pile structure, it is essential to take some measures, among which shield construction parameters should be optimized first. According to previous experience and references [55][56][57][58], the disturbance of shield tunneling to soils can be reduced by controlling the face support pressure (200 kPa), synchronous grouting pressure (250 kPa), and jacking force (3500 kPa). In addition, the effective schemes to substantially reduce the influence caused by tunneling are reinforcement of soil or adjacent pile itself, isolation, and pile foundation underpinning.…”
Section: Selection Of Protective Schemesmentioning
confidence: 99%
“…At present, there are some tunneling projects successfully constructed in SCM formation, and some technical experience has been obtained. Even though the construction technology of shallow excavation in SCM formation is far from mature, there are a lot of blanks in the design theory and construction technology of tunnel in BCM formation [10][11][12][13]. It is an ideal way to solve the engineering problems encountered in the construction of BCM formation by referring to the experience accumulated in the construction of SCM grounds [14][15][16][17][18][19][20].…”
Section: Introductionmentioning
confidence: 99%