Determination of economically viable option of liquidation the consequences of external dump deformation

Abstract: The safety factors for different variants of operation development were obtained, on the basis of which the technical and economic indicators were established and the most expedient way of restoration of dump operations in conditions of the formed landslide was chosen. The solutions were proposed for the external dump No 2 of the Central Ore Mining and Processing Enterprise (COMPE), that allow to continue its future operation. When working in the conditions of the formed landslide, three variants of the furthe… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
6
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(6 citation statements)
references
References 27 publications
0
6
0
Order By: Relevance
“…The criterion for assessing the effectiveness of the proposed mining system is the specific cost for strip-mining of 1 m 3 [19,20,21,22]. Therefore, we will calculate all cost items for this stripping site, and based on the obtained data, construct a histogram for calculating unit costs for mining the Zakhidnyi Quarry No.1 site (Fig.…”
Section: Economic Assessment Of the Proposed Mining Systemmentioning
confidence: 99%
“…The criterion for assessing the effectiveness of the proposed mining system is the specific cost for strip-mining of 1 m 3 [19,20,21,22]. Therefore, we will calculate all cost items for this stripping site, and based on the obtained data, construct a histogram for calculating unit costs for mining the Zakhidnyi Quarry No.1 site (Fig.…”
Section: Economic Assessment Of the Proposed Mining Systemmentioning
confidence: 99%
“…At the dump No 2, overburden rock is accepted at 2 dump dead ends and is dumped with the help of ЕКГ-8І and ЕШ 10/70 excavators. At the moment, ЕШ No 1 is removed from the danger zone at a distance of 100 m after the occurrence of deformation in the form of a landslide [7,8].…”
mentioning
confidence: 99%
“…Thus, in 2017 on the site of the south-western side of the dump in s.a. 170 -220, hor. +175 ... + 125 there were deformations manifested in the form of landslide with the following parameters [7,9]: a) length along the edge -410 m; b) average depth -7 m, maximal -12 m; c) the average landslide -10 m; d) volume is 850 thousand m 3 ; e) the area of landslide spread is 85 thousand m 2 .…”
mentioning
confidence: 99%
See 2 more Smart Citations