“…The method also contends with changes in production rate and grade, which are typical early in a project as further exploration and drilling take place. For example, in 2013 the annual ore processing rate studied was 12·1 Mt year −1 at an average U 3 O 8 grade of 212 ppm (Apelt, Forrester, Short and Stefan 2013), whereas in 2014 the annual ore processing rate was 8·5 Mt year −1 , with an average U 3 O 8 grade of 259 ppm (Apelt, Forrester, Short and Stefan 2014; Macusani Yellowcake Inc 2014). In 2016, with the incorporation of new areas of mineralisation, the annual ore processing rate is 10·9 Mt year −1 , with an average U 3 O 8 grade of 289 ppm (Plateau Uranium Inc 2016b).…”