2024
DOI: 10.1088/1755-1315/1319/1/012013
|View full text |Cite
|
Sign up to set email alerts
|

Determination of rational technological schemes for the completion of open-pits taking into account land reclamation

Andrii Cherep

Abstract: The analysis of objects of landscape disturbances under opencast mining is carried out. The arrangements for reclamation of residual mines and earth’s surface relief formation at the opencasts of the Pokrovskyi mining and processing enterprise are determined. The basic approaches for final extraction of opencasts in order to mining method are investigated. Reclamation processes during final open-pit mining are justified, taking into account the development of mineral reserves at the ends of the open-pit.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 12 publications
0
2
0
Order By: Relevance
“…The use of two adjacent rock chutes ensures continuous operation of the equipment, that is, when one is unloaded, the mined mass is removed from the platform of the second, and then vice versa. However, provided that the work is non-permanent and a temporary storage facility is arranged on the lower platform, a single rock chute is enough [16].…”
Section: Determining the Rational Rock Chute Parametersmentioning
confidence: 99%
“…The use of two adjacent rock chutes ensures continuous operation of the equipment, that is, when one is unloaded, the mined mass is removed from the platform of the second, and then vice versa. However, provided that the work is non-permanent and a temporary storage facility is arranged on the lower platform, a single rock chute is enough [16].…”
Section: Determining the Rational Rock Chute Parametersmentioning
confidence: 99%
“…The main parameters of the mining system of the Rozivskyi pit for the performance of kaolin mineral deposit extraction according to the current project are given in the Table 1. Excavation work [22] in the pit begins with the removal of the soil-vegetation layer with a Caterpillar D6R-II or Komatsu D65 bulldozer, the soil-vegetation layer is pushed into the side with the same bulldozer, and the Volvo EC 480D excavator is loaded into Volvo A45 trucks and taken to the temporary storage of the soil-vegetation layer on the internal dumps surface [23].…”
Section: The Choice Of Object To Studymentioning
confidence: 99%