2021
DOI: 10.15587/1729-4061.2021.231765
|View full text |Cite
|
Sign up to set email alerts
|

Determination of the electrical power increase at the generator terminals of a nuclear power plant unit at different condenser states

Abstract: It is shown that the technical condition of condensing devices of steam turbines largely determines the amount of electricity losses, reliable and economical operation of NPP units. Analysis of the heat transfer process in the condenser showed that the main causes of load reduction are determined by rising cooling water temperature and deviation of steam pressure from normal value. It is shown that among diagnostic parameters except leakage volumes there must be an assessment of contamination of the heat trans… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 12 publications
0
0
0
Order By: Relevance