Decision Making and Soft Computing 2014
DOI: 10.1142/9789814619998_0007
|View full text |Cite
|
Sign up to set email alerts
|

Determining and Prioritizing Main Factors of Supplier Reliability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0
1

Year Published

2021
2021
2022
2022

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 0 publications
0
2
0
1
Order By: Relevance
“…The strong competitive environment puts pressure on construction companies to concentrate on core competencies and provide their requirements by outsourcing [62]. Companies are becoming increasingly dependent on suppliers (i.e., material and equipment suppliers and service suppliers) [24], which have a lasting effect on the success of a project [63]. Hence, the evaluation and selection of the best-fit suppliers are of vital importance [62].…”
Section: Relationshipsmentioning
confidence: 99%
“…The strong competitive environment puts pressure on construction companies to concentrate on core competencies and provide their requirements by outsourcing [62]. Companies are becoming increasingly dependent on suppliers (i.e., material and equipment suppliers and service suppliers) [24], which have a lasting effect on the success of a project [63]. Hence, the evaluation and selection of the best-fit suppliers are of vital importance [62].…”
Section: Relationshipsmentioning
confidence: 99%
“…Some scholars identify and evaluate the risk of CM, give CM safety control methods, and believe that the lack of safety measures will lead to greater safety accidents [2]. Some studies analyze the types, characteristics, and causes of CM accidents, pointing out that the types of crane accidents include installation and dismantling accidents, accidents using machinery, falling object accidents, and the causes of accidents including cranes themselves, man-made, and natural factors, resulting in the definition of CM extrusion, falling, and tipping, and analyzing the risks of accidents in terms of operation and equipment [3][4]. Some studies have shown that the two most important risks in the construction phase are quality risk and schedule risk, for quality risk can establish a raw material incoming inspection system, establish a raw material incoming inspection system; for schedule risk, should strengthen the scientific control of the preliminary engineering design, and improve the construction work to ensure the quality of the project and avoid the consumption of resources caused by rework [5].…”
Section: Introductionmentioning
confidence: 99%
“…Kahraman (2019) utilizaram o FIS para priorizar fatores de risco relacionados à confiabilidade dos fornecedores. O funcionamento e os elementos do FIS podem ser ilustrados pela Figura 17.…”
unclassified