2022
DOI: 10.1177/14750902221076937
|View full text |Cite
|
Sign up to set email alerts
|

Determining the optimal method to upgrade shipyard infrastructures for overhaul of offshore drilling rigs using genetic algorithm: A case study for ISOICO

Abstract: The purpose of this research is to select the optimal combination of infrastructure and equipment to upgrade a shipbuilding yard to repair offshore drilling rigs considering installation time and cost of the equipment needed and the overhaul cost and time of a rig. These four components constitute a four-objective problem. To solve this problem, a list of main equipment with various capacities and installation costs was developed. Then the cost and time of overhaul of drilling rigs, as well as the installation… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 43 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?