2022
DOI: 10.11591/ijece.v12i4.pp3440-3453
|View full text |Cite
|
Sign up to set email alerts
|

Determining the Pareto front of distributed generator and static VAR compensator units placement in distribution networks

Abstract: <span>The integration of distributed generators (DGs), which are based on renewable energy sources, energy storage systems, and static VAR compensators (SVCs), requires considering more challenging operational cases due to the variability of DG production contributed by different characteristics for different time sequences. The size, quantity, technology, and location of DG units have major effects on the system to benefit from the integration. All these aspects create a multi-objective scope; therefore… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 33 publications
0
1
0
Order By: Relevance
“…The major difference between the differential gearbox front-end speed regulation wind turbine and the traditional dynamics modelling is introducing the differential gearbox speed regulation mechanism in the drive chain [37]. Therefore, establishing the dynamic model of the new front-end variable speed wind turbine is the basis and prerequisite for the subsequent control system design and performance analysis, and the laboratory team members have made some attempts in the early stage.…”
Section: 𝑦(𝑠) = 𝐴(𝑠)(𝑢(𝑠) + 𝑑(𝑠))mentioning
confidence: 99%
“…The major difference between the differential gearbox front-end speed regulation wind turbine and the traditional dynamics modelling is introducing the differential gearbox speed regulation mechanism in the drive chain [37]. Therefore, establishing the dynamic model of the new front-end variable speed wind turbine is the basis and prerequisite for the subsequent control system design and performance analysis, and the laboratory team members have made some attempts in the early stage.…”
Section: 𝑦(𝑠) = 𝐴(𝑠)(𝑢(𝑠) + 𝑑(𝑠))mentioning
confidence: 99%