2016 IEEE Power and Energy Society General Meeting (PESGM) 2016
DOI: 10.1109/pesgm.2016.7741787
|View full text |Cite
|
Sign up to set email alerts
|

Determining wind farm locations, allocation of wind farm capacity, and sizing of energy storage for 17 GW new wind power capacity in Korea

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…Moon et al introduced a weighted evaluation method to identify appropriate wind farm locations, annual wind speed, power generation capacity, and system sizing aligned with the Korean government's initiative to install 17 GW. Additionally, they utilized discrete Fourier transform and probability density models to optimise Energy Storage Systems (ESS) and maintain grid stability [ 14 ]. Yan et al developed an optimal method for sizing the ESS using a steady-state model.…”
Section: Introductionmentioning
confidence: 99%
“…Moon et al introduced a weighted evaluation method to identify appropriate wind farm locations, annual wind speed, power generation capacity, and system sizing aligned with the Korean government's initiative to install 17 GW. Additionally, they utilized discrete Fourier transform and probability density models to optimise Energy Storage Systems (ESS) and maintain grid stability [ 14 ]. Yan et al developed an optimal method for sizing the ESS using a steady-state model.…”
Section: Introductionmentioning
confidence: 99%