Developing a 3D intelligent object model for the application of construction planning/simulation in a highway project

Abstract: This study proposes a 3D intelligent object model in highway construction to electronically represent a large amount of information in highway projects based on the international standard ISO 10303. Also known as STEP (Standard for the Exchange of Product), ISO 10303 is an open standard, and has been used for data exchange in building projects of the AEC industries. Motivated by the success from the building industry, this research attempts to apply an object based intelligent model in 3D highway modeling. In … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
18
0
2

Year Published

2016
2016
2025
2025

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 22 publications
(20 citation statements)
references
References 9 publications
0
18
0
2
Order By: Relevance
“…First, in the planning and design phase (Y 1 ), BIM can be used for daylighting simulation [54] (Z 3 ) and security analysis [55] (Z 3 ). Second, in the construction phase (Y 2 ), BIM can be used for earned value management [56] (Z 2 ), cost/schedule estimation [57] (Z 2 ), and construction safety analysis [58] (Z 3 ). ird, in the operation and maintenance phase (Y 3 ), BIM can be used for daily management and emergency simulation analysis, such as energy simulation [43] (Z 1 ), user daily activity simulation [59] (Z 3 ), indoor environmental quality analysis [60] (Z 3 ), and fire personnel evacuation simulation [50]…”
Section: Analysis and Simulation Of Building Functions (X 4 )mentioning
confidence: 99%
See 3 more Smart Citations
“…First, in the planning and design phase (Y 1 ), BIM can be used for daylighting simulation [54] (Z 3 ) and security analysis [55] (Z 3 ). Second, in the construction phase (Y 2 ), BIM can be used for earned value management [56] (Z 2 ), cost/schedule estimation [57] (Z 2 ), and construction safety analysis [58] (Z 3 ). ird, in the operation and maintenance phase (Y 3 ), BIM can be used for daily management and emergency simulation analysis, such as energy simulation [43] (Z 1 ), user daily activity simulation [59] (Z 3 ), indoor environmental quality analysis [60] (Z 3 ), and fire personnel evacuation simulation [50]…”
Section: Analysis and Simulation Of Building Functions (X 4 )mentioning
confidence: 99%
“…e method focuses on the systematic identification and acquisition of construction information. For the construction cost estimation problem, Kim et al [57] started from a highway project and built a smart 3D model based on the STEP (Standard for the Exchange of products) data model to predict the cost and duration of highway construction (Z 2 ). Similarly, BIM-based cost and schedule management (Z 2 ) has also been applied in the construction phase of bridge projects [56].…”
Section: Construction Phase Based On Bim (Y 2 )mentioning
confidence: 99%
See 2 more Smart Citations
“…In the same year 2015, Hyunjoo et al [44], proposed a 3D STEP to simplify the process of defining the optimum alternative of highway alignment alternative among the provided alternatives. The motivation for building this mode from view point of developers is the limitations of the currently approaches, one example of these approaches is LandXML, which was compared and founded that it could not define the characteristics and details of structures such as bridges and tunnels.…”
Section: International Applications Of Cost Simulation In Project Manmentioning
confidence: 99%