Developing a generic risk maturity model (GRMM) for evaluating risk management in construction projects

Abstract: The literature on risk management acknowledges a growing number of Risk Maturity Models (RMM). However, for the construction sector, there is no validated RMM that is based on both theory and experts' opinions. In this article, a Generic RMM (GRMM), inspired by the EFQM model, is developed and validated to remedy this shortcoming. The GRMM uses a list of statements extracted from risk management literature by means of qualitative content analysis. The statements and the model are both validated by means of two… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
35
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
8
2

Relationship

0
10

Authors

Journals

citations
Cited by 33 publications
(37 citation statements)
references
References 40 publications
1
35
0
1
Order By: Relevance
“…The project objectives can be considered as several elements like “project scope”, “total project time”, “total project cost” and “product quality”, thus these four attributes are selected as decision attributes of constructed decision system (Monghasemi et al ., 2015). Table 2 shows explanations and the domain of each decision attribute (Bilal et al ., 2020; Hoseini et al ., 2019; Arnuphaptrairong, 2011; Dey et al ., 2007; Ropponen and Lyytinen, 2000). The objects of constructed decision system (U) are 692 finished banking software projects within the last three years in the biggest banking information technology ecosystem of Iran.…”
Section: Methodsmentioning
confidence: 99%
“…The project objectives can be considered as several elements like “project scope”, “total project time”, “total project cost” and “product quality”, thus these four attributes are selected as decision attributes of constructed decision system (Monghasemi et al ., 2015). Table 2 shows explanations and the domain of each decision attribute (Bilal et al ., 2020; Hoseini et al ., 2019; Arnuphaptrairong, 2011; Dey et al ., 2007; Ropponen and Lyytinen, 2000). The objects of constructed decision system (U) are 692 finished banking software projects within the last three years in the biggest banking information technology ecosystem of Iran.…”
Section: Methodsmentioning
confidence: 99%
“…Risk maturity models help understand the degree of sophistication of risk management practices and their effectiveness at each stage (Wieczorek-Kosmala, 2014). Meanwhile (Hoseini et al, 2019)…”
Section: Risk Maturitymentioning
confidence: 99%
“…Hoje em dia, eles têm aplicações em muitos campos (WENDLER, 2012), incluindo gestão de risco. Um dos primeiros modelos foi proposto por (HILLSON, 1997) e atualmente vários modelos de maturidade de gestão de risco são encontrados, embora concentrados em algumas áreas: setor de serviços públicos de água (MacGILLIVRAY et al, 2007a(MacGILLIVRAY et al, , 2007bPOLLARD, 2008), gerenciamento de projeto (ZOU; CHEN; CHAN, 2010;MU et al, 2014;YEO;REN;REN, 2016;HWANG;LOW, 2016;CHAPMAN, 2019;HARTONO;WIJAYA;ARINI, 2019;HOSEINI;HERTOGH;REKVELDT, 2019), cibersegurança (BOYSON, 2014) e enterprise risk management (ERM) (OLIVA, 2016).…”
Section: Modelos De Maturidade Para Gestão De Risco E Lacuna Na Liter...unclassified