2020
DOI: 10.1177/0144598720925557
|View full text |Cite
|
Sign up to set email alerts
|

Developing a new technique for the simultaneous optimization of both segmented time and injection rate for water flooding reservoirs: An analysis of Shengli Oilfield XIN-42 reservoir block

Abstract: The adjustment and control of the water injection rate is a commonly used method for increasing the cumulative oil production of waterflooded reservoirs. This article studies the production optimization problem under the condition of a fixed total water injection rate. The production process is divided into several segments. Considering the correlation between the segment’s time intervals and the well’s injection rate distribution, a simultaneous optimization of both segmented time and injection rate is propos… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 28 publications
0
0
0
Order By: Relevance