2006
DOI: 10.1061/(asce)0733-9364(2006)132:4(393)
|View full text |Cite
|
Sign up to set email alerts
|

Developing a Resource Supply Chain Planning System for Construction Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
33
0

Year Published

2008
2008
2024
2024

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 60 publications
(33 citation statements)
references
References 15 publications
0
33
0
Order By: Relevance
“…Educate and provide continuous capacity training for procurement personnel on effective assessment and resourcing procedures [113,115] Enhances managerial, technical and administrative procurement skills required to reduce resourcing challenges [113,115] {Needs Assessment and planning} Assess resource requirements based on sufficient quality, availability, supply point and time of resource need [14,116] Enables identification and selection of quality, sustainable and acceptable resources for procurement [14,117]; Enables scheduled and cost-effective resource delivery [118] Engage locals in resource assessment [14] Helps to draw knowledge on locally available resources [14] Identify and mobilise for resourcing with long lead times [116] Ensures on-time delivery of resources [116]; Mitigates disruption of production process and its negative impacts on project performance [117,119,120] Map resource markets and make provision for price variations due to seasonal variations [26] and changing market conditions [35,41] Aids effective resource delivery [35] {Procurement arrangements}…”
Section: Measures Effects {Recruitment}mentioning
confidence: 99%
“…Educate and provide continuous capacity training for procurement personnel on effective assessment and resourcing procedures [113,115] Enhances managerial, technical and administrative procurement skills required to reduce resourcing challenges [113,115] {Needs Assessment and planning} Assess resource requirements based on sufficient quality, availability, supply point and time of resource need [14,116] Enables identification and selection of quality, sustainable and acceptable resources for procurement [14,117]; Enables scheduled and cost-effective resource delivery [118] Engage locals in resource assessment [14] Helps to draw knowledge on locally available resources [14] Identify and mobilise for resourcing with long lead times [116] Ensures on-time delivery of resources [116]; Mitigates disruption of production process and its negative impacts on project performance [117,119,120] Map resource markets and make provision for price variations due to seasonal variations [26] and changing market conditions [35,41] Aids effective resource delivery [35] {Procurement arrangements}…”
Section: Measures Effects {Recruitment}mentioning
confidence: 99%
“…The approaches of supply chain management have gradually been adopted by other industries [3]. When structuring a supply chain network, the supply chain partners are easily identified [6].…”
Section: Literature Review Construction Supply Chain Managementmentioning
confidence: 99%
“…The high variability of construction environments results in high construction cost variation, especially in material cost [3]. Inadequate planning may cause material shortages that delay the project schedule or a substantial increase in inventory costs by producing or supplying materials earlier than they are needed at the construction site.…”
Section: Introductionmentioning
confidence: 99%
“…The optimization objectives are generally set to minimize the inventory cost, or minimize buffer sizes and time of material waiting prior to being further processed (Tserng et al 2006;Walsh et al 2004;Xu et al 2016). However, research in supply chain optimization in the context of construction planning has yet to address the project scheduling problem by (1) incorporating the supply of materials as explicit constraints alongside labor constraints and technology constraints; and (2) simultaneously achieving the efficiency of supply chain management and the efficiency of labor resource utilization through optimization.…”
Section: Introductionmentioning
confidence: 99%