2022
DOI: 10.31026/j.eng.2022.01.03
|View full text |Cite
|
Sign up to set email alerts
|

Developing Crisis Management System for Construction Projects in Iraq

Abstract: Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq fa… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4
2

Relationship

1
5

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 4 publications
0
4
0
Order By: Relevance
“…However, the total constructability score for both designs is considered as a good percentage because their score achieved more than half of the specified constructability score for the design attributes which is (37%). Also, this compression is involved the cost calculation for both stairs, for the first model the cost of material, needed laborer and equipment for one-meter cubic is (430,000 IQD) according to the project's bill of quantities; so, the stair cost is (1,314,427.44 IQD). While, in the second model it is assumed that it adds one unskilled laborer with cost equal to (25,000 IQD) and the cost of stair steps is (665,000 IQD).…”
Section: Comparison Between the Two Model's Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…However, the total constructability score for both designs is considered as a good percentage because their score achieved more than half of the specified constructability score for the design attributes which is (37%). Also, this compression is involved the cost calculation for both stairs, for the first model the cost of material, needed laborer and equipment for one-meter cubic is (430,000 IQD) according to the project's bill of quantities; so, the stair cost is (1,314,427.44 IQD). While, in the second model it is assumed that it adds one unskilled laborer with cost equal to (25,000 IQD) and the cost of stair steps is (665,000 IQD).…”
Section: Comparison Between the Two Model's Resultsmentioning
confidence: 99%
“…The Iraqi construction industry like many other construction industries around the world suffers from many issues that lead to different problems to the construction project. The main cause of these issues is lacking connection between the designer and the contractor [1]. The traditional construction system is divided into two main disciplines, design and construction, the little communication between designers and contractors before the start of construction, will make the construction a dynamic, complex, and fragmented process [2].…”
Section: Introductionmentioning
confidence: 99%
“…It is carried out to the point where the potential project is socially responsible, technically possible, commercially viable, and has a feasible business opportunity exit. The predominant perspective in the construction industry suggests that construction stakeholders prioritize maximizing profits during the execution phase of any project [6][7]. FS is a crucial and consequential aspect in the building industry and other technical domains, as it greatly influences investment decision-making.…”
Section: Introductionmentioning
confidence: 99%
“…The construction sector is one of the sectors most affected by the global financial crisis and the economic recession that followed (Fadhil and Burhan, 2022). Risk management is a complex process that becomes increasingly complex in changing business environments.…”
Section: Introductionmentioning
confidence: 99%