2020
DOI: 10.21608/jesaun.2021.169075
|View full text |Cite
|
Sign up to set email alerts
|

Developing Framework to Optimize the Preparation of (EOT) Claims Using Integration of (LPS) and (BIM) Techniques in Construction Projects

Abstract: Construction projects face delays and disturbances that could be caused by one of the contracting parties, both of them, or beyond their control. Proving the delay needs a significant effort to introduce all details, documents, and records which explain the causes of the delays. The contractor needs to submit a claim, whether it is extension of time (EOT) claim or any claim with an adequate definition, causation, liabilities, analysis of delays to get an extension of timerelated to the risk event. Claims prepa… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 25 publications
0
1
0
Order By: Relevance
“…This method simply can compare what was supposed to happen to what happened. Therefore, "data" power and role must be significantly considered (Atanasov et al, 2020;El-Samadony et al, 2020;Türkakın et al, 2020). In contrast, it is worth noting that the real-time data tracking approach is categorised as part of automation topics in the construction industry.…”
Section: Publications Based On Type Of Technologiesmentioning
confidence: 99%
“…This method simply can compare what was supposed to happen to what happened. Therefore, "data" power and role must be significantly considered (Atanasov et al, 2020;El-Samadony et al, 2020;Türkakın et al, 2020). In contrast, it is worth noting that the real-time data tracking approach is categorised as part of automation topics in the construction industry.…”
Section: Publications Based On Type Of Technologiesmentioning
confidence: 99%