2018
DOI: 10.1016/j.trd.2018.06.004
|View full text |Cite
|
Sign up to set email alerts
|

Development and validation of energy demand uncertainty model for electric city buses

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
33
0
2

Year Published

2018
2018
2023
2023

Publication Types

Select...
7
2
1

Relationship

3
7

Authors

Journals

citations
Cited by 67 publications
(35 citation statements)
references
References 36 publications
0
33
0
2
Order By: Relevance
“…In addition to the high initial investment, the life cycle costs (LCC) depend on the selected charging strategy (e.g., overnight vs. opportunity charging) and the selected battery capacity that is defined by the charging strategy [2]. However, the energy consumption rate (ECR) varies because of uncertainties in weather and driving behavior [3]. Variation in ECR may cause delays in the charging schedules, which are hard to predict, because such delays have not been an issue with diesel buses.…”
Section: Introductionmentioning
confidence: 99%
“…In addition to the high initial investment, the life cycle costs (LCC) depend on the selected charging strategy (e.g., overnight vs. opportunity charging) and the selected battery capacity that is defined by the charging strategy [2]. However, the energy consumption rate (ECR) varies because of uncertainties in weather and driving behavior [3]. Variation in ECR may cause delays in the charging schedules, which are hard to predict, because such delays have not been an issue with diesel buses.…”
Section: Introductionmentioning
confidence: 99%
“…In reality, there is variation in the energy demand that is caused by uncertainty of environmental conditions, such as ambient temperature and road-grade, in addition to driving style, traffic and auxiliary power usage variations [20]. These uncertainties are unpredictable in the planning phase of operation and charging schedules.…”
Section: Discussionmentioning
confidence: 99%
“…In the case of these lines, electric buses with a length of 18 m and a capacity C of battery equal to 240 kWh and an energy consumption u c equal to 1.8 kWh/km are going to be used. In the literature, the mentioned consumption often amounts to 1.3-1.5 kWh/km, however, buses with a length of 12 m are most frequently used in the research [3,11,23,24]. Additionally, it should be noted that all three lines are quite long and their routes lead through areas with high traffic density.…”
Section: Methodology Of Researchmentioning
confidence: 99%