2003
DOI: 10.1016/s0920-3796(03)00334-x
|View full text |Cite
|
Sign up to set email alerts
|

Development of a long reach articulated manipulator for ITER in vessel inspection under vacuum and temperature

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0

Year Published

2005
2005
2024
2024

Publication Types

Select...
7
3

Relationship

2
8

Authors

Journals

citations
Cited by 23 publications
(10 citation statements)
references
References 1 publication
0
10
0
Order By: Relevance
“…A long reach multilink carrier is characterized by its larger work space and reduced mass. Unfortunately, increasing the number of joints with reduction of mass increases significantly structural compliance [5]. When considering the size of EAST, operational range requirement, and the potential to be developed to a components exchange remote maintenance system when necessary, a pair of robotic systems penetrating the EAST chamber through two symmetrical equatorial ports was selected.…”
Section: Design Requirementsmentioning
confidence: 99%
“…A long reach multilink carrier is characterized by its larger work space and reduced mass. Unfortunately, increasing the number of joints with reduction of mass increases significantly structural compliance [5]. When considering the size of EAST, operational range requirement, and the potential to be developed to a components exchange remote maintenance system when necessary, a pair of robotic systems penetrating the EAST chamber through two symmetrical equatorial ports was selected.…”
Section: Design Requirementsmentioning
confidence: 99%
“…Each module includes pitch (±45 • ) and yaw (±90 • ) joints linked with a parallelogram structure (four bar mechanism) that keep yaw . Its weight is about 120 kg [3,4].…”
Section: The Aia Robotmentioning
confidence: 99%
“…provide RH advanced features for plants during operations [13]; provide RH systems for exceptional maintenance [1][2][3]7,8]; provide RH Means for decommissioning phases [11]. To drive the R&D programme COGEMA followed a three steps scheme to best fit to the various requirements which stands for:…”
Section: Fuel Reprocessing Plant Overviewmentioning
confidence: 99%