2022
DOI: 10.1080/03071375.2022.2030603
|View full text |Cite
|
Sign up to set email alerts
|

Development of a low-cost traffic counter for assessing likelihood of impact for tree risk assessment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
3
1

Relationship

2
2

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 23 publications
0
3
0
Order By: Relevance
“…Additionally, arborists with risk assessment training were significantly more likely to assign lower likelihood of impact and likelihood of failure ratings, as well as lower overall risk ratings. Klein et al (2016) compared the perceived occupancy rates with actual occupancy rates as measured by traffic counters (Klein et al 2022a). In this study, likelihood of impact ratings among participants with experience and credentialing were less variable than those without.…”
Section: Introductionmentioning
confidence: 85%
“…Additionally, arborists with risk assessment training were significantly more likely to assign lower likelihood of impact and likelihood of failure ratings, as well as lower overall risk ratings. Klein et al (2016) compared the perceived occupancy rates with actual occupancy rates as measured by traffic counters (Klein et al 2022a). In this study, likelihood of impact ratings among participants with experience and credentialing were less variable than those without.…”
Section: Introductionmentioning
confidence: 85%
“…Previous studies have demonstrated the subjectivity associated with each component of risk assessment, including proximity to targets [13][14], observed structural weaknesses that increase likelihood of failure [15], and severity of consequences of impacting a target [16][17].…”
Section: Introductionmentioning
confidence: 99%
“…Previous studies have demonstrated the subjectivity associated with each component of risk assessment, including proximity to targets [13,14], observed structural weaknesses that increase the likelihood of failure [15], and severity of consequences of impacting a target [16,17]. One aspect of tree risk assessment has received more experimental scrutiny than the others: assessing the likelihood of failure.…”
Section: Introductionmentioning
confidence: 99%