2010
DOI: 10.1016/j.apradiso.2009.11.031
|View full text |Cite
|
Sign up to set email alerts
|

Development of a neutron-activated concrete powder reference material

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2011
2011
2022
2022

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 18 publications
(6 citation statements)
references
References 9 publications
0
6
0
Order By: Relevance
“…To meet the needs of RMs in the field of D&D, it is tempting to make one from the samples taken on the construction sites and dedicated to destructive analyses in the laboratory [11], [12]. However, in the field of radiological analysis, often an ILC will allow verifying that the material is suitable for use as RM, from the consensus values obtained.…”
Section: Rm Scarcity and Use Of Ilcs In Radioactivity Measurementsmentioning
confidence: 99%
“…To meet the needs of RMs in the field of D&D, it is tempting to make one from the samples taken on the construction sites and dedicated to destructive analyses in the laboratory [11], [12]. However, in the field of radiological analysis, often an ILC will allow verifying that the material is suitable for use as RM, from the consensus values obtained.…”
Section: Rm Scarcity and Use Of Ilcs In Radioactivity Measurementsmentioning
confidence: 99%
“…As a summary, reliable gamma emitter analysis requires properly maintained and calibrated detector, suitable measurement geometry for the sample size and activity level and coincidence correction especially with short source-to-detector distance. Additionally, the most reliable efficiency calibration is possible using experimental measurements with reference material as close as possible to sample matrix [33]. However, the analysis of 152 Eu is more complicated compared to 60 Co, since 152 Eu decays with electron capture, positron emission and β − sending out X-rays (4 photons), betas and gammas (132 photons).…”
Section: Critical Considerations In the Gamma Emitter Analysismentioning
confidence: 99%
“…The lack of suitable reference materials in the NORM industries is a significant issue [2,[7][8][9][10][11][12], which also makes initial validation of procedures challenging. Candidate reference soil and sediment materials from British Geological Survey (BGS) were digested using lithium borate fusion and the concentration of 232 Th and 238 U calculated and compared with the reference values as an initial validation of the method.…”
Section: Characterisation Of Reference Materials For Naturally Occurring Radioactive Materialsmentioning
confidence: 99%
“…Additionally, the accurate characterisation of radionuclides is reliant on measurement of certified reference materials (CRM) that ensure quality control and metrological traceability through method validation and calibration of instruments [7]. Owing to the wide range of sample types across industrial sectors, the current lack of CRM is a significant constraint [2,[7][8][9][10][11][12].…”
Section: Introductionmentioning
confidence: 99%