2020
DOI: 10.3390/app10113902
|View full text |Cite
|
Sign up to set email alerts
|

Development of BIM-Based Risk Rating Estimation Automation and a Design-for-Safety Review System

Abstract: Various laws and guidelines on designing for safety have been developed world-wide, and these were used to identify risks at construction sites in advance through qualitative and quantitative safe management. In other words, attention is being paid to safe management based on design drawings and models rather than field visits. It was predicted that the introduction of the concept of design-for-safety would minimize risk at construction sites through safe management in the design phase. This is because the eff… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
14
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 22 publications
(21 citation statements)
references
References 9 publications
0
14
0
Order By: Relevance
“…An electronic questionnaire was prepared from acquired theoretical knowledge of hazard detection in BIM [15,17,[20][21][22][23][24][42][43][44][45][46]51,52], and practical knowledge with BIM management based on experience in the construction industry in Slovakia. It was composed of 33 questions connected by logical links, so that it was possible to exclude inappropriate respondents (e.g., if they did not perform preparation and control of HS on their projects or did not use BIM on any project).…”
Section: Preparation Of Survey Questions and Syllabus For The Interviewmentioning
confidence: 99%
“…An electronic questionnaire was prepared from acquired theoretical knowledge of hazard detection in BIM [15,17,[20][21][22][23][24][42][43][44][45][46]51,52], and practical knowledge with BIM management based on experience in the construction industry in Slovakia. It was composed of 33 questions connected by logical links, so that it was possible to exclude inappropriate respondents (e.g., if they did not perform preparation and control of HS on their projects or did not use BIM on any project).…”
Section: Preparation Of Survey Questions and Syllabus For The Interviewmentioning
confidence: 99%
“…[14,15]. (3) Project digitalization [16][17][18]-this trend simulates different scenarios during the project life cycle to optimize the resources from early stages [19], and is considered the most important trend in the AECO industry from an information technology perspective [20].…”
Section: Introductionmentioning
confidence: 99%
“…For example, in South Korea DfS is applied only to certain public construction projects, and it is supposed to be implemented upon 80% completion of the construction document preparation phase. Therefore, DfS in South Korea has many limitations owing to the fact that the applicable range of construction projects is relatively narrow compared to those in other countries [18][19][20][21][22][23].…”
Section: Introductionmentioning
confidence: 99%
“…The DfS process is implemented in the design phase and is carried out in collaboration with multiple participants during its application to the construction phase. During this process, however, participants have different perceptions of DfS problems and the corresponding improvements that are necessary [6,10,16,[21][22][23][24][25][26][27][28]. Therefore, to enhance the effects of DfS, each participant must increase his awareness of DfS and provide suggestions for improvement priorities [28].…”
Section: Introductionmentioning
confidence: 99%