2014
DOI: 10.1016/j.nucengdes.2013.08.045
|View full text |Cite
|
Sign up to set email alerts
|

Development of generic soil profiles and soil data development for SSI analyses

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 1 publication
0
3
0
Order By: Relevance
“…Fill soils are usually placed on the turbine island side because the land is either reclaimed, or to make space for tunnels and balance of plant. Nuclear and turbine islands are not generally founded on sites with considerable soil deposits, although some engineers and scientists use soil sites for their studies [19][20][21][22][23].…”
Section: Typical Nuclear Power Plantsmentioning
confidence: 99%
“…Fill soils are usually placed on the turbine island side because the land is either reclaimed, or to make space for tunnels and balance of plant. Nuclear and turbine islands are not generally founded on sites with considerable soil deposits, although some engineers and scientists use soil sites for their studies [19][20][21][22][23].…”
Section: Typical Nuclear Power Plantsmentioning
confidence: 99%
“…The Flexblue design is under development in France (IAEA, 2012). In the USA, three main integral pressurized water SMRs are under development: mPower, NuScale and the Westinghouse SMR (Halfinger and Haggerty, 2012;Parker et al, 2013;Liu and Fan, 2014). International Reactor Innovative and Secure is being designed by an international consortium (Carelli et al, 2004).…”
Section: Emerging Trends In New Nuclear Power Plant Designsmentioning
confidence: 99%
“…Using modular design and construction, the SMRs are planning to develop inherently safer reactors (with passive safety features) that are economic, proliferation resistant, flexible for different configurations and applications and generate less waste, etc. (Taso, 2011;Vigoroso and Hinze, 2013;Poullikkas, 2013;IAEA, 2013IAEA, , 2012Halfinger and Haggerty, 2012;Parker et al, 2013;Liu and Fan, 2014). Fourth, practically, all the SMRs are still on the drawing boards.…”
Section: Emerging Trends In New Nuclear Power Plant Designsmentioning
confidence: 99%