1977
DOI: 10.1080/00207547708943148
|View full text |Cite
|
Sign up to set email alerts
|

Development of integrated production scheduling system for iron and steel works

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

1985
1985
2008
2008

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 12 publications
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…However, too many constraints resulted in computational difficulties. The work by Sato et al (1977) was an early effort at making use of an expert system to solve the iron and steel scheduling problem. Jacobs et al (1988) put forward a goal programming model to simulate the decision of those experts responsible for developing the production schedule making mill operations.…”
Section: Literature Reviewmentioning
confidence: 99%
“…However, too many constraints resulted in computational difficulties. The work by Sato et al (1977) was an early effort at making use of an expert system to solve the iron and steel scheduling problem. Jacobs et al (1988) put forward a goal programming model to simulate the decision of those experts responsible for developing the production schedule making mill operations.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Next, a heuristic approach is used to evaluate the bids. An example of using expert system techniques for iron and steel production scheduling is provided by Sato et al [6]. Numao and Morishita [7] described an expert system application to perform co-operative scheduling in which the schedule was modified by the scheduler using a graphical user interface.…”
Section: Literature Reviewmentioning
confidence: 99%