2005
DOI: 10.3844/jcssp.2005.395.399
|View full text |Cite
|
Sign up to set email alerts
|

Development of Integrated Production Scheduling System in the Process Industry

Abstract: This study introduces a three-level hierarchical production planning and scheduling approach developed and implemented in a resin factory. Our approach proposes at the first level a mixed-integer linear programming for solving the aggregate planning model. At the second level, a weighted-integer goal-programming model is developed to disaggregate the developed aggregate plans. A sequencing algorithm is developed for the third level that tends to minimize the total weighted tardiness. Real industrial data is us… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 12 publications
0
2
0
Order By: Relevance
“…Emami-Mehrgani et al (2011) discussed that industry strives to cut down on production costs and optimize profit through operating methods consistent with various legal requirements. In this regard, numerous of scholars have made attempts to schedule via divergent methods including classical& fuzzy logic scheduling (Tzimopoulos et al, 2008) genetic algorithm (Taghavifard et al, 2009;Gao and Liu, 2007), neural network artificial (Venkatachalam et al, 2008), fuzzy logic (Omar, 2007) and programming model (Chen, 2010), real time scheduling algorithm (Ahmad and Othman, 2010), Petri nets (Ghoul et al, 2007) and hierarchical scheduling (Omar et al, 2005) so on.…”
Section: Introductionmentioning
confidence: 99%
“…Emami-Mehrgani et al (2011) discussed that industry strives to cut down on production costs and optimize profit through operating methods consistent with various legal requirements. In this regard, numerous of scholars have made attempts to schedule via divergent methods including classical& fuzzy logic scheduling (Tzimopoulos et al, 2008) genetic algorithm (Taghavifard et al, 2009;Gao and Liu, 2007), neural network artificial (Venkatachalam et al, 2008), fuzzy logic (Omar, 2007) and programming model (Chen, 2010), real time scheduling algorithm (Ahmad and Othman, 2010), Petri nets (Ghoul et al, 2007) and hierarchical scheduling (Omar et al, 2005) so on.…”
Section: Introductionmentioning
confidence: 99%
“…Moreover, Mahamed K.Omar, et.al, [54] introduced a three-level hierarchical production planning and scheduling approach to cope with planning problem in resin factory. In this research, planning decisions are divided into three levels which each level is strongly related to the others.…”
Section: An Integrated Problemmentioning
confidence: 99%