“…Emami-Mehrgani et al (2011) discussed that industry strives to cut down on production costs and optimize profit through operating methods consistent with various legal requirements. In this regard, numerous of scholars have made attempts to schedule via divergent methods including classical& fuzzy logic scheduling (Tzimopoulos et al, 2008) genetic algorithm (Taghavifard et al, 2009;Gao and Liu, 2007), neural network artificial (Venkatachalam et al, 2008), fuzzy logic (Omar, 2007) and programming model (Chen, 2010), real time scheduling algorithm (Ahmad and Othman, 2010), Petri nets (Ghoul et al, 2007) and hierarchical scheduling (Omar et al, 2005) so on.…”