Modern Tunneling Science and Technology 2017
DOI: 10.1201/9780203746653-28
|View full text |Cite
|
Sign up to set email alerts
|

Development of MGF Method Based on the Evaluation of Forepiling Supporting Mechanism

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The length of the steel pipes and thickness of the grouted zone were important factors when analysing the Umbrella Arch method as shown by Kitamoto et al (2001) who used steel pipes that were almost half the length of conventional ones used in Umbrella Arch method to reinforce the tunnel crown. They named this pre support method as Multi-Ground Forepiling (MGF) method.…”
Section: Numerical Analysis For Forepoling Methodsmentioning
confidence: 99%
“…The length of the steel pipes and thickness of the grouted zone were important factors when analysing the Umbrella Arch method as shown by Kitamoto et al (2001) who used steel pipes that were almost half the length of conventional ones used in Umbrella Arch method to reinforce the tunnel crown. They named this pre support method as Multi-Ground Forepiling (MGF) method.…”
Section: Numerical Analysis For Forepoling Methodsmentioning
confidence: 99%