Development of the 230-Kv Ring Bus for Grand Coulee Power Plant

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

1948
1948
1952
1952

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 10 publications
(1 citation statement)
references
References 9 publications
0
1
0
Order By: Relevance
“…A. W, Darland it with the Bureau of Reclamation, Couke Dam, Wath., W. H. Oagatt «with the Bureau of Reclamation, Denver, Colo., and W. AC. Load· is with the Westingbouse Electric Corporation, Eait Pittsburgh, Pa.kva 3-cycle circuit breaker tested at Grand Coulee Dam have been described previously before the Institute 1. The dead-tank construction not only provides inherent mechanical strength but also is adapted for the use of conventional through-type current transformers surrounding the lead-in bushings.…”
mentioning
confidence: 99%
“…A. W, Darland it with the Bureau of Reclamation, Couke Dam, Wath., W. H. Oagatt «with the Bureau of Reclamation, Denver, Colo., and W. AC. Load· is with the Westingbouse Electric Corporation, Eait Pittsburgh, Pa.kva 3-cycle circuit breaker tested at Grand Coulee Dam have been described previously before the Institute 1. The dead-tank construction not only provides inherent mechanical strength but also is adapted for the use of conventional through-type current transformers surrounding the lead-in bushings.…”
mentioning
confidence: 99%