2018
DOI: 10.1007/s11277-018-5253-0
|View full text |Cite
|
Sign up to set email alerts
|

Development on Intellective Collecting Apparatus of Slope Monitoring Data with Human Machine Interaction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
5
0

Year Published

2020
2020
2021
2021

Publication Types

Select...
2

Relationship

2
0

Authors

Journals

citations
Cited by 2 publications
(5 citation statements)
references
References 11 publications
0
5
0
Order By: Relevance
“…Furthermore, we have used the human-computer interface to operate and monitor the acquisition apparatus, which helps to greatly improve the efficiency and accuracy of data acquisition and transmission with a relatively simple structure. In the slope monitoring system by Shen R. et al [30], the acquisition apparatus is designed by leveraging the technology of human-computer interaction, which is more convenient for field operation. However, the acquisition apparatus is mainly suitable for slope monitoring, and the human-computer interface shall be developed based on the requirements of dike monitoring.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…Furthermore, we have used the human-computer interface to operate and monitor the acquisition apparatus, which helps to greatly improve the efficiency and accuracy of data acquisition and transmission with a relatively simple structure. In the slope monitoring system by Shen R. et al [30], the acquisition apparatus is designed by leveraging the technology of human-computer interaction, which is more convenient for field operation. However, the acquisition apparatus is mainly suitable for slope monitoring, and the human-computer interface shall be developed based on the requirements of dike monitoring.…”
Section: Discussionmentioning
confidence: 99%
“…Studies need to be conducted to address the question of which method is more suitable for dike monitoring. In such areas as civil engineering, water conservancy, traffic, and agriculture engineering, several new technologies have been introduced into the monitoring system, including but not limited to GIS ( [29]), human-computer interaction technology ( [30], [31]), parallel computing ( [32], [33]), cloud computing ( [34], [35]), wireless networks ( [36]- [39]) and APP ( [40]), which have also found applications in dike monitoring to some extent ( [29], [34]). It is thus particularly necessary to use advanced technologies to improve the performance of the dike monitoring system.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The interface is mainly for input and modification of the system, as well as the testing parameters, testing operation, result output, and equipment communication. The apparatus uses the WEINVIEW cMT3072 human-computer interface [42,43] for data acquisition, control, and communication. The interface can acquire data from the accessed sensors of the temperature, pressure, and water level, as well as control the PLC and the servo motor through the communication port RS485.…”
Section: Testing Principlesmentioning
confidence: 99%
“…The humancomputer interface cMT3072 can meet the technical requirements of data acquisition and transmission, equipment control, data calculation, convenience, and safety for seepage index measurement for low-permeability materials. The software EasyBuilder Pro for WEINVIEW is a new generation of human-computer interface software with excellent performance [42,43].…”
Section: Testing Principlesmentioning
confidence: 99%